Risk Factors and Control Measures in Construction Decoration and Renovation Project Management
Download as PDF
DOI: 10.25236/icacel.2025.041
Corresponding Author
Mingzhao Yang
Abstract
This study addresses the persistent issues of quality, schedule delays, and safety hazards in construction decoration and renovation project management. Based on practical project management experience, it analyzes the specific manifestations of four core risk factors: material quality and supply, craftsmanship execution, design changes, and safety and environmental compliance. Corresponding control measures and their operational logic are summarized. By analyzing the mechanisms of risk formation and control pathways, this paper details the implementation of key measures: establishing a full-process material control mechanism, strengthening craftsmanship inspection and disclosure, standardizing change management procedures, and implementing dual controls for safety and environmental compliance. These measures provide a practical reference for enhancing decoration and renovation project management, reducing risk incidence, and achieving coordinated control over project quality, schedule, and safety.
Keywords
Construction Decoration and Renovation, Project Management, Materials, Craftsmanship, Design